Kotka tee public water supply and sewerage design work III stage

Customer: Lemminkäinen Eesti AS

Date: 05/2015 — 09/2015

Project volume: Gravity-flow sewerage pipeline 2.2 km; pressure sewerage pipeline 0.7 km; drainage pipeline 0,4km; water supply pipeline 2,9 km; 1 wastewater pumping station.